For our final building consent ( the CCC requires this since the house was built 10 years ago and was missing some paperwork) we need a gas fitter to do this; "New gas testing cert - has not been provided to council - a new test can be completed in retrospect by another registered gas worker" The house is 2 story in Westmorland, CHC, with gas water heating, 1 gas fire, 1 gas oven and 1 bath controller, 1 shower controller. 2 outside bottles. Please provide hourly cost (with approx hours estimate) or fixed price if possible. Short notice, but availability Friday afternoon, or next week, would be perfect if that was possible, if not we can look at options.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Multiple job requirements were all completed very professionally & in a timely manner. I would definitely recommend CJ's based on my experience. The price was also very fair for the list of work I had.
Work carried out by an employee of the company
Reviewed on 09-08-2016
Partner with Builderscrack
Get work