Published on 12th June 2020
I am looking to install a gas hob, to replace the electric job currently in place.
There is no current gas pipe work in place, so this would need to be installed.
I would be looking for the pipe work to run down under the floor of the house, and come out a few metres away, with maybe 5m of pipe work in total.
Ideally the install would support 2x 9kg bottles with an ability to switch over when the pressure in one bottle became too low.
No specific timeframe in mind currently.
I am yet to source the stove top, so guidance on whether I need to have this available prior to the work being completed would also be useful.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Got in touch quickly, and came and had a look to quote."
Review posted by Matt on 14th September 2020
Verified communication review
Partner with Builderscrack
Get work