Boatshed on riverside drive, need to start with 5 piles put in that need immediate attention, next year another 20 piles. I usually do it myself but am over it. I use H5 fencing post about 150mm diameter cut to length as all are a bit different about 1.5m average ( If you have better timber or suggestion will look at it) dig down about 30-50cm. its super soft mud over super hard clay, then tie into the underside of the deck, concrete in, Access is at low tide only about a 5hr window.