Published on 1 June 2025
Floor is prepped, we need a pour (supply only) of ready mixed concrete for the first side of the shed of approx 4.6m3 with a slump of 110 (been advised to get 20 mpa) We are however ALSO open to quotes that include the supply and finishing of concrete as it may save us a job and be advantageous.. There will be a second part after a few months when we have that side prepped. May need a spout as well to place the concrete in shed. Welcome to come and quote but looking to have this done Friday 6th June 2025
Partner with Builderscrack
Get work