Published on 29th March 2025
Approx 8m x 6m pad to be laid for a shed. Will need to be reinforced. Will have a full spec plan for it. Site will be prepared. You will need to box it and pour slab. Getting plan next week and looking to do site work in next two weeks so ready to go in two to three weeks.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Ethan did a great job right through. Good communication and flexibility with the job. Finish is great and will have him back to do other jobs."
Work carried out by the owner/operator
Review posted by Dylan on 20th April 2025
Verified Builderscrack review