Review

Ground preperation for building

Job image
Job image
Job image

Job description

Placing & Formwork Lincoln, Selwyn

Published on 28th July 2024

Concrete tiles removed wooden poles removed bobcat required to fill 4x6x.300 with gravel/topsoil and compacted level so building can start fir sleepout


Full workmanship review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

"Ethan very easy to get hold of he and his off sider were like machines just went for it from start o finish and the weather was not kind..Highly recommend his services."

Work carried out by the owner/operator

Review posted by Shane on 21st August 2024

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started