I am wanting to get a section of my house relevelled. Half of the house is on a concrete pad and the other half is on timber framing with piles I am assuming piles as I havent been able to get under the timber floor part yet. It is an older 1920s built house. The timber part has dropped up to 50 odd mm next to the concrete slab and this drop is evident mainly in the lounge. I am wanting someone to come out and see what can be done and also to provide a quote for the project. I assume a jack and pack would be the best solution.