We are doing a build in ohakune (snowmass drive) however have hit a snag with the geotech report showing hard ground is 0.8 - 1.8m so need additional engineering work for the foundation. Relatively flat ground, looking for a quote for the engineering work and secondly the possibility of doing the work
#1 | Tradie 1 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work