Working along side Mainmark Engineering to stack and pack the foundation once re levelling has been done. Also needed to create an access point to the foundations either via the internal flooring or creating one externally. We need to have someone available before the 6th July to create the access point and then need them available on the 6th and possibly 7th July.
#1 | Tradie 1 |
|
109 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work