I have dug out earth from a basement room. Some walls need underpinning ranging from about 300mm to 600mmm, other walls have been underpinned and others don't need it. I've had an engineer look at it and it seems pretty straight forward, but needs to be done in sections and would probably suit a retired builder, or someone with flexibility in the Milford area. I have the muscle and need a brain and experience.
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work