- Foundations (posts, concrete, beams etc) to be installed for a 20ft (6m) container. - 7m x1m retaining wall. - apart from concrete all materials are onsite. I currently have a container on the property that is leaning against the garage so it needs to be moved. Before that can happen I need a new, level foundation installed so the Hiab has somewhere to place it. Once the container is moved then a new 7m retaining wall can be installed.
#1 | Tradie 1 |
|
68 jobs | No longer in contact |
#2 | Tradie 2 |
|
169 jobs | No longer in contact |
#3 | Tradie 3 |
|
217 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 46 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 14 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 174 jobs | No longer in contact |
Partner with Builderscrack
Get work