I have a pile (wooden column embedded in concrete footing) where soil has exposed and undercut the footing at the side. I need two new piles to be installed at each side of the existing pile, to the same size. This pile is underneath an existing 2-storey residential. Previous owner undercut the pile to create more headroom for the basement. Job ideally to be done between 16-21 Sept 2019. Advice needed if bdg consent is required.
#1 | Tradie 1 | Not reviewed | 1 job | Secured job |
#2 | Tradie 2 |
|
62 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
34 jobs | No longer in contact |
#6 | Tradie 6 |
|
332 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 46 jobs | No longer in contact |
Partner with Builderscrack
Get work