It is one story dwelling, subflooring 600mm from the ground. Whenever the washing machine is working the house is shaking. It is easy to access. I need pricing for installing a pile under the washing machine. it needs blocking between joists, --- pile with --- deep concrete pad inquired
Partner with Builderscrack
Get work