Bathroom renovation has revealed that the pile in the bathroom has sunk and need to be relevelled. We purchased the house just under 1 month ago (the sunken pile was not picked up by the builder we had look through the house pre-purchase) but was pointed out to us by a different builder who turned up to do the renovation. We have not been able to move into the house yet as the bathroom was urgently in need of attention. We need the pile relevelling done ASAP so that we can proceed with the bathroom renovation to be able to move in. The floorboards have already been removed for the renovation so pile is very accessible.
#1 | Tradie 1 |
|
216 jobs | No longer in contact |
Partner with Builderscrack
Get work