We have purchased a 15m2 "pod" (cabin/unit) with a bathroom and kitchenette and need to have 6 piles installed to place the pod onto. I have a full foundation plan from the company. They recommend the piles go into "Good Ground" which needs to be determined. I would imagine it's clay here but can't be sure.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Jason has been so good to work with, knows what he’s doing, doesn’t muck about and has the tools for the job. I’m really happy with the quality of his work.
Work carried out by the owner/operator
Reviewed on 30-10-2018
Partner with Builderscrack
Get work