Published on 22nd October 2024
Hello,
We have a consent job running where we are building an extension and need the following done:
- Drill 9 piles 400mm diameter 4.0m deep.
– Supply and stand 9 poles 150-175mm SED 4.9m long.
- Supply and place 25MPa concrete to piles.
-Supply and install 1 ABV micro pile up to 4.0m deep including 2 HD12 starter bars.
Engineer documentation, geo-tech, and architect plans available. We would need this done fairly soon.
Partner with Builderscrack
Get work