I need an old villa to be releveled (or repiled). It has easy access under the house, with an approx. height of 1.8m at the most and 0.5m at the least. The house is around 100years old so the piles are as expected. The house is 3 bedroom at 100m2 total. Cheers.
#1 | Tradie 1 |
|
109 jobs | No longer in contact |
Partner with Builderscrack
Get work