Review

Lay a slab of concret

Job image

Job description

Other (Foundations) Halswell, Christchurch

Published on 10th November 2025

Needing the current concrete slab to be poured over so it can sit 50mm higher and be extended 400mm to one side. Current slab is --- , once finished the new slab needs to be --- for a garden shed to sit on top. Measurements are taken 100mm off of the fence line


Full workmanship review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

"Solid work, good timing, good price, cant complain"

Work carried out by the owner/operator

Review posted by Ryan on 16th December 2025

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started