Published on 6th October 2025
New slab required to repair house foundation.
Old slab (very thin) removal, ground preparation, new slab pour with nib wall.
Structural walls new studs and new cladding.
This is an existing bathroom in the house.
We have had an external quote already, but have struggled getting any other quotes.
2600mm x 2100mm
Has good foundation to tie back in to.
| Quality of work |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"The team were fantastic and the communication was great.
Troy walked us through some issues found along the way and explained everything in good detail including the proposed solution.
Very pleased with the results and would happily recommend."
Work carried out by the owner/operator
Review posted by Mike on 28th March 2026
Verified work review
Partner with Builderscrack
Get work