I have a 20m2 sleepout and need carpet removed as well as existing vinyl in the bathroom. I have already purchased laminate for the main room (about 18 m2) and vinyl planks for the bathroom (about 2 m2). Whenever you can is fine, this is not urgent.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic work! All done within a short timeframe and on budget. Will absolutely call him back when I need more work done. Highly recommended!
Work carried out by the owner/operator
Reviewed on 28-04-2022
#1 | Tradie 1 |
|
33 jobs | Secured job |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work