1. Pull back carpet. 2. prep sub floor which may include levelling uneven floor. 3.Install already supplied Engineered clip to together hardwood floor to butt up against existing Engineered hardwood floor. Will require adhesive and any underlay / other consumeables. approx. 18 sqm area. 4. Cut / stretch carpet to edge of new floor and fit naplock bar to the edge of newly installed floor. 5. Looking at 2nd half of July
Partner with Builderscrack
Get work