My Bathroom and toilet had tiles that I have removed. However, for the vinyl people to come in an lay it I have to remove all of the tile cement or mortar and this annoying subfloor that just crumbles when I try to ply it out. The original floor beneath is corkboard. Bathroom and toilet are seperate and small. Bathroom est 3 x 2.5 metres and the toilet is smaller.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Overall, a satisfied customer. All aspects were great (e.g cost, workmanship, and communications) The work was completed with great attention to detail and the tradesman was friendly and efficient at communicating about the progress of the job. Definitely, recommend them.
Work carried out by an employee of the company
Reviewed on 12-04-2018
#1 | Tradie 1 | No recent reviews | 10 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 34 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 32 jobs | No longer in contact |
Partner with Builderscrack
Get work