To lay click board flooring
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brian did an excellent job of laying my click board flooring - we have an older two storey house and the downstairs area of the dinette, large kitchen, hallway, toilet area, back entry area were 90% laid on the first day from 8.30am to 4pm with the final laying completed the next day - tricky areas as there were 4 doors leading into the hallway which required a lot of cutting - the trim was completed on the third day also tricky in the hallway and toilet area. Was quoted 3days - spoton.
Work carried out by the owner/operator
Reviewed on 05-11-2019
Partner with Builderscrack
Get work