55m2 of laminate flooring to be laid over concrete pad. The carpet and some tiles have to be removed. The kitchen has been installed and side panels would have to be moved. Skirting boards are still in place, we would want the flooring to go under the skirting boards. There is a part in the kitchen that may need self levelling compound as we had to cut into the slab to run water pipes then back fill with concrete.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
#2 | Tradie 2 |
|
38 jobs | No longer in contact |
Partner with Builderscrack
Get work