Small job, new concrete slab. Lay Commerical grade lino on bathroom floor 1.8 m by 2.8m
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Daniel didn't have any concrete drill bits and ended up using one of my drill bits. unfortunately the one he used was not a concrete drill bit and therefore wrecked the bit.
Work carried out by an employee of the company
Reviewed on 18-06-2021
#1 | Tradie 1 | No recent reviews | 9 jobs | Secured job |
Partner with Builderscrack
Get work