Installation of roughly 18 sqm recycled oregon pine on concrete floor. This will involve grinding and levelling of some of the concrete floor. Also on roughly 9sqm there is cork glued to the concrete which needs to be removed first.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mike was great right from the start. On time and delivered what was promised. Excellent communication and everything was highly professional.
Work carried out by the owner/operator
Reviewed on 16-07-2020