1950’s batch added on to over the years. Wooden lounge floor needs re-level when it was added to had a peak in the middle. Looking at having a resin poured to level, or other ideas. End result will be carpeted. 5m x 5.4m
#1 | Tradie 1 |
|
129 jobs | No longer in contact |
#2 | Tradie 2 |
|
155 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 31 jobs | No longer in contact |
Partner with Builderscrack
Get work