Our en-suite bathroom had been a wet room previously. We are installing a new shower unit and retiling floors and walls. I need to level the floor prior to the installation of the shower tray and floor tiles. Have removed the tiles as well as the adhesive (painful job!!) except under the loo.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work. Efficient and good at taking time to understand what we as the client were after. Thanks Stuart for your good work.
Work carried out by the owner/operator
Reviewed on 31-07-2017
Tradesperson reply
"Thanks for the review,the client was very easy to communicate with which helped the job go smoothly as well."
Partner with Builderscrack
Get work