Floor needs preparation to be flat and sealed to install timber floor overlay. Approx 22 metres in whole area but parts require work. Would like done prior to end of July
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
60 jobs | No longer in contact |
#3 | Tradie 3 |
|
104 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
#5 | Tradie 5 |
|
92 jobs | No longer in contact |
Partner with Builderscrack
Get work