Published on 2nd June 2026
Looking for a skilled floor fixer or carpenter to complete three related jobs in one visit:
**1. Floor transition – tiles to timber (2 locations)**
The existing transition strip between large-format grey tiles and original timber floorboards needs to be replaced or reinstalled. The floors are uneven so the transition needs to be beveled/ramped to eliminate the gap and create a smooth, safe join between the two floor types.
**2. Front door stoop repair**
The front door threshold/stoop has a gap that needs to be repaired or replaced so the door meets Healthy Homes draught-stopping compliance standards.
**3. Corner skirting**
Install skirting at the corner where the timber floor meets the tiled area to give a clean, finished look.
Photos available on request. All work is indoors except the front door stoop. Please provide a quote covering all three jobs. Preference for someone who can complete all in a single visit.
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
4.0
|
Their professionalism and responsiveness |
"Really great work for what was an awkward job. Proposed several solutions and let us pick which suited us and our budget best. Work was done quickly and to a high standard. Highly recommend +++"
Work carried out by the owner/operator
Review posted by Samantha on 16th June 2026
"Thanks for your review Samantha, much appreciated!"
16th June 2026
Verified work review
Partner with Builderscrack
Get work