We have removed a fireplace front but before we gib we need the floor repaired. The floor will need some sort of compound and then I think Matai board installed. There is about 1500 x 500 mm. We don’t need the floor finished/sealed as that will be done later on the project.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work