I had lino laid in my kitchen a while back and the rest of the roll has been sitting in my office waiting for me to replace the shower before it can be laid in the bathroom and toilet. I'm sure this is a job which can be done after another job if you have one out this way. The man who laid the kitchen lino is having surgery so it out of action. The shower is being replaced on 21st January.
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work