Step 1. Prepare the surface.<Including sanding>278m2 Step 2. Sweeping and cleaning of the floor. Step 3. Prime the floor with a suitable epoxy primer. Step 4. Fill all cracks, holes etc with epoxy grout. Step 5. Application of the first coat of epoxy paint. Step 6. Apply the product with a roller. Step 7 Apply the final coat.
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 |
|
73 jobs | No longer in contact |
#3 | Tradie 3 |
|
106 jobs | No longer in contact |
#4 | Tradie 4 |
|
35 jobs | No longer in contact |
#5 | Tradie 5 |
|
44 jobs | No longer in contact |
Partner with Builderscrack
Get work