Approx 50 year old customboard flooring needs to be removed and replaced with a plywood floor or alternative. Current flooring has dips in between joists. 40 square metres approximately Ground floor of a 2 level townhouse.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 23-10-2019
#1 | Tradie 1 |
|
27 jobs | Secured job |
#2 | Tradie 2 |
|
73 jobs | No longer in contact |
#3 | Tradie 3 |
|
35 jobs | No longer in contact |
#4 | Tradie 4 |
|
58 jobs | No longer in contact |
#5 | Tradie 5 |
|
347 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 7 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 19 jobs | No longer in contact |
#8 | Tradie 8 |
|
169 jobs | No longer in contact |
Partner with Builderscrack
Get work