We are removing out strip vinyl from a strand board floor and need the area sanded and thin lined as it's currently stuck straight to the strand board. We need vinyl laid in the bathroom, toilet, hall/entrance and kitchen/dining. We then also need carpet, underlay and smooth edge laid in the lounge. 36 square meters in total. The break up of the room layouts is attached. We are optional as to weather we supply the vinyl or you do :) need to install end of June/start of July.
#1 | Tradie 1 | No recent reviews | 74 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 18 jobs | No longer in contact |
#4 | Tradie 4 |
|
90 jobs | No longer in contact |
Partner with Builderscrack
Get work