3 m long wooden hand rail and posts alongside concrete steps requires replacement due to ivy damage. Painting to be done later by third party.
Workmanship |
5.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
4.0
|
Fence alongside steps completed to good solid standard of construction and in timely manner. However costs increased by 27% above original quote without any significant change in scope. Freight cost for “forgotten” materials exceeded actual cost of materials.
Work carried out by the owner/operator
Reviewed on 10-05-2018
Tradesperson reply
"Was asked to quote for two jobs, and only quoted for one. I clearly outlined the job I had quoted for, however I did forget to add the second job. I sent through an additional quote for the second job, which I ended up discounting $70. I stuck to the dollar on the two quotes I made"