Hi there, We have a single fence line (approx 25m) that we would like built. We have the wood (posts/railing/palings) already, it is largely the building/labour that we require. The fence that is being replaced has around 15m which is pre-set into concrete. We will be removing this prior to the person building the new fence, however, will probably require a concrete cutter + post hold borer to put new holes in the concrete, for the new posts. The fence that you'll be replacing is the brown fence on left hand side of property (running from front of section to back of section). The property now has a driveway (latest photo). We've already built 2/3's of the fence, down the right hand side of property and front (see photos) - this is what we would like replicated (railings inside the posts). Look forward to hearing back. Cheers, Rick
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Roger was fantastic with his communication - attending the property multiple times, after hours, to ensure what he was doing was what we were after. The end result was a fence which matched our current fence perfectly - fitting the brief we gave him. Would happily recommend.
Work carried out by the owner & subcontractors
Reviewed on 05-12-2018
Tradesperson reply
"Thanks?"
#1 | Tradie 1 | No recent reviews | 31 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 37 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 156 jobs | No longer in contact |
#4 | Tradie 4 |
|
155 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 22 jobs | No longer in contact |
Partner with Builderscrack
Get work