Gates need shortening by 100mm . Hinges need bending back to adjust angle of gate meeting point and drop bolts moved to correct height. Concrete is Higher than previous level.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
What a lovely Contractor! Great Work. Very Prompt. Did a better job than expected!
Work carried out by the owner/operator
Reviewed on 24-06-2020
Partner with Builderscrack
Get work