Review

Waterblasting garden paths and deck

Job description

Water blasting
Waitakere

I need my concrete garden path (60metres long, 1 metre wide) and wooden bridge (5 metres long, 1 metre wide, pine) and wooden deck (12x6 metres, gum) waterblasted. Deck surface only, not balistrades/handrails. You'll need hoses which stretch 100 metres, as this is distance from road /outdoor tap, to end of path (I've done 1st 40metres of path). Paths last done 3 years ago. Some patches of moss on paths. Deck new 3 years ago. I want careful operator who will waterblast wooden decking and bridge carefully, not ripping to pieces. No chemicals, just waterblasting. When I have done this job previously it has taken ~5-hours total.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Harry did a great job of waterblasting my wooden deck & concrete paths. V v happy wt his quote, comms & workmanship. I felt v comfortable wt Harry working at my property while I was away. Absolutely recommend his excellent service.

Work carried out by the owner/operator
Reviewed on 10-08-2019

Tradesperson reply
"Nic was an absolute delight to work for and wouldn't hesitate to work for her anytime."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo