Closed job

Dig ten 30cm diameter holes (40cm deep) for timber piles

Job description

Post Hole Digging
Whangarei

Placing a cabin on piles and need to dig 10 holes for the timber piles. Access to the site is up a grass driveway that's quite steep, so reasonable traction is required. This is an urgent one, hoping to get it done in the next day or two.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo