Eroded slope needs to be prepared/cleaned for hydroseeding. Length: 15m Height: lowest point 2m, highest point 4m Work can start ASAP
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The job was completed timely and to the budget. Excellent communication, the quote received straight after the visit. Very happy with the result!
Work carried out by the owner/operator
Reviewed on 23-01-2022
Partner with Builderscrack
Get work