Active job

Hand dig small trench

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Trenching
Wellington

Need a trench hand dug for a gas line. Trench needs to be about 400-500mm deep and only wide enough for a gas main. Trench is about 18m long. The trench needs to be dug through a garden and a lawn. The last 1 metre the trench goes through a brick path and this needs to be chipped out. I have already had brick path concrete cut for it to be easily chipped out. After gas main installed. Back fill and a basic clean up. I can organise brick path to be repaired.


Trade professionals

#1 Tradie 1 No recent reviews 16 jobs Secured job
#2 Tradie 2
19 jobs No longer in contact
#3 Tradie 3
13 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo