Looking for somebody to dig circa 30 post holes for 1.2 to 1.5m high timber retaining wall. Will need the bank cut back slightly too. I need somebody that can get them evenly spaced. If you’re keen for more work I’d also be happy to have you concrete the posts in too.
#1 | Tradie 1 |
|
50 jobs | No longer in contact |
#2 | Tradie 2 |
|
279 jobs | No longer in contact |
#3 | Tradie 3 |
|
67 jobs | No longer in contact |
Partner with Builderscrack
Get work