Moving around 30-40 m^3 of dirt, levelling a small rise on the front of the section, and dropping the level of a drive slightly to take hardfill and pavers. Job is for the excavation only.
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 |
|
279 jobs | No longer in contact |
#3 | Tradie 3 |
|
139 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work