We have an area spanning approx 7m x 6m deep that needs to be leveled out and soil removed from site. The highest point will need to be dug out about 1 - 1.2m. There is currently a concrete slab that also needs to be removed from site. The carport we will have removed prior. Awesome if you do concreting too?
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
58 jobs | No longer in contact |
#5 | Tradie 5 |
|
31 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work