Job 1: I have four concrete planter boxes, approx. 4m long x 500mm wide x 400mm high. They contain soil with limestone chips. I would like them dug out and spoil removed. Vehicle access to the planters is easy and flat. The soil is reasonably loose. Job 2. Two small grass areas, approx. 3m x 50mm have been sprayed and have died off. I would like the top dug off for removal and the ground dug over. Vehicle access is easy and flat
#1 | Tradie 1 |
|
56 jobs | No longer in contact |
Partner with Builderscrack
Get work