I need a parking area for a caravan 10m by 6m. It involves moving 6m3 of topsoil which can be dumped on site and then filling with sand or gap7. We only need to scrape off about 100mm of top soil.
#1 | Tradie 1 |
|
79 jobs | Secured job |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work