Published on 29th January 2024
Remove grass and soil to create a flat parking area. and fill with gravel. Area approx 10 x3.3m. May need small amount of timber boxing
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Scott did an amazing job with a rough area. He removed tree stumps, excavated, installed drain flow and gravelled the area. The price was very competitive and I am delighted with the result."
Work carried out by the owner/operator
Review posted by Janet on 17th April 2024
Verified work review
Partner with Builderscrack
Get work