scrape back 5 m wide soil/clay. Put top soil into pile at top and possibly remove remaining soil. See attached picture. The site is open and able to access from all sides easily.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
#4 | Tradie 4 |
|
38 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work