Complete earthworks for 39m2 extension: Clear existing topsoil, vegetation (low hedge approximately 300mm, a few shrubs and 1 approximately 3m high tree) Dig footing 240mm wide x 300mm below existing ground level x 20.6m long. Supply and 150mm min compacted AP40 hardfill and20mm sand blinding after builders have completed the footing.
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
#5 | Tradie 5 |
|
38 jobs | No longer in contact |
#6 | Tradie 6 |
|
66 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 4 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 14 jobs | No longer in contact |
Partner with Builderscrack
Get work